47kW solar install for Mildura Rural City Council
A 47kW solar PV system at the Mildura Landfill (Transfer Station), part of the Council’s plan to power its all-electric buildings with 100 percent renewable energy by 2030.
A 47kW solar PV system at the Mildura Landfill (Transfer Station), part of the Council’s plan to power its all-electric buildings with 100 percent renewable energy by 2030.
Project Overview:
The Mildura Rural City Council, committed to achieving zero net emissions for its operations by 2050, embarked on a project to install solar photovoltaic (PV) systems at its various buildings and facilities. As part of their goal to power all-electric buildings with 100 percent renewable energy by 2030, the Council engaged Foreman-Sheean to install a solar PV system at the Mildura Landfill (Transfer Station). This case study highlights the challenges faced, the solution provided by Foreman-Sheean, and the resulting benefits.
The Challenges
The initial challenges for the project included sourcing funding and completing the project within a short timeframe. Foreman-Sheean’s services were engaged to overcome these challenges and install a solar PV system at the Mildura Landfill (Transfer Station). One unique challenge was the location of the solar system, which was more than 500 meters away from the electrical point of supply. Adhering to regulatory limits and optimising energy export to the grid posed a delicate balance.
Scope of Work / Solution
Foreman-Sheean provided a comprehensive solution to address the challenges faced. A 47kW solar PV system was installed, consisting of 94 Sunpower Performance monocrystalline solar panels, each with a capacity of 500W. To efficiently manage the system, a 50kW Sungrow inverter was incorporated. Funded by Sustainability Victoria’s Community Power Hubs Program and Mildura Rural City Council, the project was one of several community energy projects delivered throughout the Loddon Mallee region in partnership with the Bendigo Sustainability Group.